Aluminium Window Installation Process

Aluminium Window Installation Process

Line positioning to aluminum alloy doors and Windows water installation, corrosion treatment, aluminum alloy doors and Windows installation in place, aluminum alloy Windows fixed, door and window frame and wall clearance processing, doors and Windows fan and door window glass installation, installation of hardware accessories.

Marking location

(1) according to the installation position, size and elevation of doors and Windows in the design drawing, measure the edge lines of doors and Windows on both sides according to the Central Line of doors and Windows.If it is multilayer or high-rise building, with the edge line of top floor door window is accurate, with line drop or theodolite will door edge line is guided below, mark mark in each floor door window place, to individual not straight mouth edge should pick pick processing.

(2) the horizontal position of doors and Windows shall be subject to the horizontal line of floor indoor +50cm, which shall be used to measure the elevation of the lower skin of the window upward and to find the straight spring line. Each floor must maintain the same elevation of the lower skin of the window.

Aluminum window water installation

According to the requirements of the construction drawings will be water fixed on the aluminum alloy window, and to ensure the correct position, firmly installed.

embalmed

(1) if there is a requirement for the design of anti-corrosion treatment on the exterior surface around the door and window frame, it shall be handled according to the design requirements.If the design does not require, can be coated with anticorrosive paint or paste plastic film for protection, so as not to cement mortar directly with aluminum alloy doors and Windows surface contact, produce electrochemical reaction, corrosion of aluminum alloy doors and Windows.

(2) when installing aluminum alloy doors and Windows, it is better to use stainless steel parts for the installation of metal parts such as connecting iron parts and fixing parts if they are fixed by connecting iron parts.Otherwise must undertake anticorrosive treatment, lest produce electrochemical reaction, corrode window of aluminium alloy door.

Install aluminum alloy doors and Windows in place

Install aluminum alloy door and window frames according to the delimited door and window positioning line.And timely adjust the door and window frame horizontal, vertical and diagonal length in line with quality standards, and then temporarily fixed with a wooden wedge. 

Aluminum alloy doors and Windows fixed

(1) when iron parts are embedded in the wall, the iron feet of aluminum alloy doors and Windows can be directly welded to the embedded iron parts on the wall, and the welding place shall be subject to rust prevention treatment.

(2) when there is no embedded iron parts on the wall, metal expansion bolts or plastic expansion bolts can be used to fix the iron feet of aluminum alloy doors and Windows to the wall.

(3) when there is no embedded iron parts on the wall, an electric drill can also be used to drill a hole with a depth of 80mm and a diameter of 6mm on the wall, and 6rmn reinforcing bar of type L of 80mm x 50mm can be used.Apply 108 glues mud to the long end of the hole and then push it into the hole.After 108 cement slurry is finally solidified, weld the iron feet of aluminum alloy doors and Windows with the embedded 6mm steel reinforcement.

Between door window frame and wall body aperture processing

(1) after aluminum alloy doors and Windows are installed and fixed, concealed engineering acceptance shall be carried out first, and cracks between door, window frame and wall shall be dealt with timely according to design requirements after passing.

(2) if the design is not required, elastic insulation material or glass wool felt strip can be used to fill the gaps in layers, leaving 5~8mm deep groove mouth on the outer surface to fill in the paste or sealant of the joint.

Installation of door and window fans and window panes

(1) door and window fans and Windows glass shall be installed after the decoration of wall surface at the mouth of the cave is completed and accepted.

(2) after the sliding door window is installed and fixed in the door and window frame, install the window and door fan with good glass into the sliding groove inside the frame as a whole and adjust the gap between the window and the fan.

(3) open doors and Windows in the frame and fan frame assembly on the wall, install fixed glass, that is, first adjust the gap between the frame and fan, and then install the glass into the fan and adjust the position, and finally insert sealing strip and sealant.

(4) the ground spring door shall be installed after the door frame and ground spring host are installed and fixed in the ground.Insert the glass into the door frame and put it into the frame together, adjust the gap of the frame fan, and finally fill in the sealing strip and sealant of the door fan glass.